Timer Operations Actions and Alerts (TOAA) Examples
This TOAA technology in the Autonomous RAZN is to safely Autonomously do anything to make sure the system is save, or to run in low-power modes to have a Timer wake up the RAZN and monitor and control what every you want.
Communicate with Raveon’s data radio modem inside this RAZN. TCP/IP Ethernet ports are available, and RS-485 serial ports are on all RAZNs.
A MODBUS Latching Terminal command was created to pulse Latching Solenoids reliably with MODBUS commands.
To meet your needs, Raveon created this TOAA easy to use RAZN which can be a RTU or PLC, with wireless data links built into it, and many great IO features.
RAZN RV-N55 Has Safety Features, and our TOAA
RAZN with TOAA has More Safety and Security in SCADA Devices.
We offer more features, great performance, and a reliable product at an exceptional price.
This complete TOAA solution can remotely control things that are even miles away.
RAZN contains IO Terminal ports.
And inside is a reliable Computer CPU to do MODBUS, IOs, and TOAA.
On Ethernet terminal port processes MODBUS TCP messages.
Raveon Crated TOAA to Make SUPPER SAFE Devices.
Here is a Summary of TOAA Safety Features:
This TOAA has many Safe Features to Automatically Run This RAZN or Remote RAZN devices.
The TOAA user can Set Up TOAA to make this SCADA device Safe.
T is TIMER plan. Setup whatever Time you want. mS or Seconds, or Hours or Days.
O is OPERATION plan. After timer, then an Operation will be tested.
A is ACTION plan. After Operating, then any Action you want will Occur.
A is ALERT plan. After Operating, then and Alert can trigger it you want.
Here is TOAA Safety Features You can Setup:
RAVEON Researched SCADA industry, and found that previously many Cities and States with SCADA totally Failed.
other SCADA devices Failed! Because: (connetion failed) or (Computer broke)
This TOAA Feature can Automatically Run To be Safe.
T TIMER plan. You Set how Often you want to Check IOs or Communications.
Timer can trigger the speed you want to Operation.
O OPERATION plan. It will Operate Many Thinks you want to monitor.
It monitors the way you want, and it can start Actions if Operation Triggers.
A ACTION plan. Can be to Control and Output Pins, or send MODBUS message to other SCADA devices.
This RAZN Action can send Messages to other SCADA devices for Safety.
A ALERT plan. If you want to hear this TOAA Action, it can send an Alert to any other Device.
TOAA Overview
In the Remote Autonomous Zone Note (RAZN), the TOAA Events are setup with three parameters (Timer, Operation, and Action) and an Alert can be triggered in Actions also. The timer specify as precisely at a day, hour, minute, and second to activate. It can create a New Alarm Event with TOAA technology using MODBUS commands. Timer Operation Actions can be setup in any way you would like, with an APP or with Configuration Commands.
Timer Operation Actions can be setup in any way you would like, with an APP or with Commands. The TOAA smart timer technology in the RAZN can be used to do what you want at a specific time.
- The TOAA timer in the RAZN that triggers time can be set to:
- A specific month, and date, and time
- All months on a specific date.
- All weeks on a specific day or any specified days of the week.
- Every day, at a certain time (Hour, minute, and second)
- Every hour at a certain second do something.
- Every few days, hours, minutes, or seconds as you setup, it will do what you want.
- When the Timer triggers, you specify the Operation this Remote Zone Node (RAZN) should perform. The Operation is setup to read inputs, and registers, which for you can read:
- Switches, digital inputs,
- Voltage inputs
- 4-20mA current inputs.
- Location, angle, temperature, and vibration
- And many other things to read
- When the Operation reads what you want, it will trigger an Action based on your desires. If the Operation reading did not cause an Alert, then nothing else will happen.
- If the Operation caused an Action to take place, the actin that takes place is setup by you. The RAZN can perform many different Actions
- Send a Test Message that you want based on the Operation that happened.
- Send a MODBUS message as needed.
Output some serial port text data or TCP/IP text data to a
This TOAA is Made in America.
Raveon designed this TOAA and RAZN for SCADA in California America.
TOAA
TOAA Applicatin notes is in AN250.
AN250(TOAA) (pdf) RAZN Deives have TOAA (Timer Operation Actions and Alerts).
This TOAA is super reliable operation for SCADA boards.
The TOAA can get setup in multiple TOAA features.
Each TOAA can have 1 to 4 Actions assigned to it.
OPERATIONs
CENSOR Testing
The RAZN can test any Sensor to see if there is a big Problem.
This is great to Censor monitor Cas or Water.
Temperature
When the temperature shown in register 5002 exceeds 40 degrees, output terminal #9 will be turned on.